Owing to a mishap, the actual show starts about 20 minutes into the recording. It’s just long enough for me to mention progress with blast, and compare the Coire Glas pumped storage scheme in Scotland, which will be the largest in the world with 30 GWh of capacity, to the daily output of one EPR nuclear generating unit, of which two are being built at Hinkley Point C, 38·4 GWh. The UK grid is already one of the best–provided in the world with storage, with 24 GWh. Since average electrical consumption of the UK (over the course of a year) is 36 GW, the total after this addition will be 90 minutes of average system load. A far cry from the 10 days or more that wind– and solar–heavy energy supply projections call for!